Abstract:In order to improve the assembly efficiency of Airbus A220 aircraft door production line and reduce the labor and man-hours, firstly, the assembly time data of door production line was measured by time measurement method based on lean thinking in this paper, and the number of tooling needed to improve the production capacity is determined; Secondly, the Spaghetti diagram was used to analyze the logistics trend of operators in the assembly process, and the possible waste phenomenon is analyzed. Based on the waste phenomenon and the characteristics of door assembly process flow, the door production line is arranged according to the principle of product clustering. At the same time, the layout form of the whole station serial and the local bottleneck station parallel are determined referring to the IE (industrial engineering) method, then the door lean production line is established. Finally, 3D rendering was conducted for the overall layout by 3ds Max software.
刘敏,王大维,杨艳瑞,杨五兵. 空客 A220 飞机舱门精益生产线规划研究[J]. 航空制造技术, 2021, 64(8): 50-57.
LIU Min, WANG Dawei, YANG Yanrui, YANG Wubing. Lean Production Line Planning for Airbus A220 Aircraft Door. Aeronautical Manufacturing Technology, 2021, 64(8): 50-57.