In general, only time is optimized when using the traditional multi-Agent way (TMAW) to solve the jobshop scheduling problem based on contract net protocol, which ignores the requirement of multi-objective optimization for scheduling system. In essence, task optimum allocation between Agents is single-step optimization. Thus very limited boost is made to the performance of the scheduling system. To solve the problems, the multi-Agent scheduling model is replanned
and an interval-synergy-auction scheduling strategy (ISASS) is proposed in this paper. Time, cost, machine load and energy consumption are optimized globally in a certain time window in this strategy. And different optimal trends can be got by changing weighting factors. Finally, a simulation test validates the effectiveness. Influence on the scheduling performance under different time windows and different weighing factors is also studied so as to guide the actual productive practices.
基金资助:国家自然科学基金(U1637211);江苏省青蓝工程。
作者简介: 管晨丞:硕士研究生,研究方向为作业车间动态调度及多Agent智能体系统。
引用本文:
管晨丞,唐敦兵,魏鑫,沈小雨. 基于区间协同拍卖策略的改进多Agent车间调度模型研究[J]. 航空制造技术, 2019, 62(7): 34-42.
GUAN Chencheng, TANG Dunbing, WEI Xin, SHEN Xiaoyu. Research on Modified Multi-Agent Model for Job-Shop Scheduling Based on Interval-Synergy-Auction Scheduling Strategy. Aeronautical Manufacturing Technology, 2019, 62(7): 34-42.