Home
|
About Journal
|
Editorial Board
|
Instruction
|
Publication Ethics Statement
|
Subscriptions
|
Contacts Us
|
Chinese
Aeronautical Manufacturing Technology
2014
,
Issue (4)
: 58-61
DOI
:
Current Issue
|
Archive
|
Adv Search
|
Abstract
References (0)
Related Citation (11)
Download:
PDF
(1186 KB)
Export:
BibTeX
|
EndNote
(RIS)
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
Cite this article:
URL:
http://www.amte.net.cn/EN/
OR
http://www.amte.net.cn/EN/Y2014/V57/I4/58
本文共有参考文献14篇,因篇幅所限,未能一一列出,如有需要,请向本刊编辑部索取。
[1]
LIU Min, WANG Dawei, YANG Yanrui, YANG Wubing.
Lean Production Line Planning for Airbus A220 Aircraft Door
[J]. Aeronautical Manufacturing Technology, 2021, 64(8): 50-57.
Copyright © Editorial Board of Aeronautical Manufacturing Technology
Supported by:
Beijing Magtech