Research on Dynamic Scheduling of Flexible Job-Shop Based on Multi-Agent
YANG Bojian1, 2, DU Li1, GUO Jingren1
1. University of Electronic Science and Technology of China, Chengdu 611731, China;
2. Science and Technology on Altitude Simulation Laboratory, Sichuan Gas Turbine Establishment, Aero Engine Corporation of China, Mianyang 621703, China
In order to improve the adaptability of scheduling strategy to the change of the arrival density of the workpiece, the dynamic scheduling method in flexible job-shop was studied. Firstly, the dynamic scheduling system of flexible manufacturing based on multi-agent system is constructed according to the investigation results and agent modeling method. And combining with the complex structure processing characteristics of flexible manufacture, the operation mechanism of scheduling task decomposition, machine tool selection and task allocation is improved, and forming the task decomposition mechanism based on the process, machine tool selection mechanism based on the machining accuracy and dynamic time windows scheduling method based on scheduling rules. Finally, the feasibility of the proposed dynamic scheduling method in the scenario of work-piece density change is verified by experiments, which has a certain guiding significance for the current actual flexible job-shop production activities.
杨博见,杜丽,郭景仁. 基于多Agent的柔性作业车间动态调度方法研究[J]. 航空制造技术, 2023, 66(6): 99-107.
YANG Bojian, DU Li, GUO Jingren. Research on Dynamic Scheduling of Flexible Job-Shop Based on Multi-Agent[J]. Aeronautical Manufacturing Technology, 2023, 66(6): 99-107.