Abstract:Based on state of aviation subcontract manufacture (ASCM) and experience of aviation product manufacture in China, the method and characteristic of ASCM project management are analysed at present, and the multi-level integrated project plan of ASCM, with its control method, its integrated product team (IPT) is given under concurrent engineering condition, the effect of ASCM project management is introduced in an aircraft company.