[1] Thornton A C. Variation risk management: focusing quality improvements in product development and production. New Jersey: John Wiley and Sons, 2004.
[2] Maropoulos P G, Guo Y W, Jamishidi J, et al. Large volume metrology process model: A framework for integrated measurement with assembly planning. CIRP Annals-Manufacturing Technology,2008,57(1):477-480.
[3] Brecher C, Vitr M, Wolf J. Closed-loop CAPP/CAM/CNC process chain based on STEP and STEP-NC inspection tasks. International Journal of Computer Integrated Manufacturing, 2006, 19(6): 570-580.
[4] Maxham D.空间误差补偿技术(VEC)大型机床标定的创新实用方法.航空制造技术,2010(13):46-59.
[5] 朱绪胜,郑联语.基于关键装配特性的大型零部件最佳装配位姿多目标优化算法.航空学报,2012,33(9):1726-1736.
[6] ASME B89.4.19 Performance evaluation of laser-based spherical coordinate measurement system. American Society of Mechanical Engineers, 2006.
[7] Muelaner J E, Wang Z, Jamshidi J, et al. Study of the uncertainty of angle measurement for a rotary-laser automation theodolite(R-LAT). Proc of the IMechE, Part B: Journal of Engineering Manufacture, 2009, 223(8):217-229.
[8] 马骊群,王继虎,曹铁泽,等.激光跟踪仪测角误差的位移标定法.计量学报, 2009,30(5A):76-78.
[9] 郑联语,邵建,朱绪胜. 集成于CATIA 的大尺寸测量软件系统. 航空制造技术,2012(11): 42-44.