|
Abstract A mathematical model for aviation concurrent multi-project resourcconstrained scheduling optimization is built and an improved particle swarm algorithm is put forward to carry out concurrent scheduling for multi-project and to solve the net optimization problem. Finally, the simulation calculation is carried out for concurrent assembly plan of a certain aircraft, which validates this method.
|